臨邊護欄防護作業(yè)操作的事項介紹

來(lái)源:http://www.hzlvneng.com/   發(fā)布時(shí)間:2024-03-13

在臨邊護欄作業(yè)施工時(shí)重要的是,大于一切,但盡管三令五申強調作業(yè),但還是有很多企業(yè)違反規定沒(méi)有按照政策去施工,導致了生產(chǎn)問(wèn)題時(shí)有發(fā)生,給和社會(huì )造成很大損失。因此頒布臨邊洞口作業(yè)施工標準規范工地操作施工,這是繼91年標準后2016年新的基本規定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺、交叉作業(yè)及網(wǎng)搭設的,應在施工組織設計或施工方案中制定高處作業(yè)技術(shù)措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應按類(lèi)別對防護設施進(jìn)行檢查、驗收,驗收合格后方可進(jìn)行作業(yè),并應做驗收記錄。驗收可分層或分階段進(jìn)行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應對作業(yè)人員進(jìn)行技術(shù)交底,并應記錄。應對初次作業(yè)人員進(jìn)行培訓。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應根據要求將各類(lèi)警示標志懸掛于施工現場(chǎng)各相應部位,夜間應設紅燈警示。高處作業(yè)施工前,應檢查高處作業(yè)的標志、工具、儀表、電氣設施和設備,確認其完好后,方可進(jìn)行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應根據作業(yè)的實(shí)際情況配備相應的高處作業(yè)防護用品,并應按規定正確佩戴和使用相應的防護用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對施工作業(yè)現場(chǎng)可能墜落的物料,應及時(shí)拆除或采取固定措施。高處作業(yè)所用的物料應堆放平穩,不得妨礙通行和裝卸。工具應隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應隨時(shí)清理干凈;拆卸下的物料及余料和廢料應及時(shí)清理運走,不得隨意放置或向下丟棄。傳遞物料時(shí)不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應按現行標準《建設工程施工現場(chǎng)消防技術(shù)規范》GB 50720的規定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進(jìn)行高處作業(yè)時(shí),應采取防滑、防凍和防雷措施,并應及時(shí)作業(yè)面上的水、冰、雪、霜。當遇有6級及以上強風(fēng)、濃霧、沙塵暴等惡劣氣候,不得進(jìn)行露天攀登與懸空高處作業(yè)。雨雪天氣后,應對高處作業(yè)設施進(jìn)行檢查,當發(fā)現有松動(dòng)、變形、損壞或脫落等現象時(shí),應立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對需臨時(shí)拆除或變動(dòng)的防護設施,應采取可靠措施,作業(yè)后應立即恢復。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關(guān)內容請點(diǎn)擊http://www.hzlvneng.com希望本文能夠為您帶來(lái)幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://www.hzlvneng.com I hope this article can be helpful to you. Thank you for reading!

国产精品1000夫妇激情啪发布| 老师上课没戴奶罩看到奶头| 人妻夜夜添夜夜无码AV| 亚洲AV产在线精品亚洲第一站| 上司人妻互换HD无码中文字幕| 乖把屁股撅起来喷出来H| 久久精品亚洲AV无码乱码三区| 精品久久久久久久久久久AⅤ| YY6080韩国三级理论无码| 亚洲AV无码AV制服丝袜在线| 精品无码国产污污污免费网站2| 丁香五月色情久久久久| 亚洲精品一区二区另类图片| 年轻的朋友4 韩剧在线观看| 精品国产一区二区三区AV性色| 女人和拘做受全过程免费| 狠狠噜狠狠狠狠丁香五月| 成人性毛片免费观看黄| 国产YEEZY| 小雪你的奶好大把腿张开| 无码国产色欲XXXXX视频| 久久人妻无码毛片A片麻豆| 老熟女草BX×| 日本韩国男男作爱GAYWWW| 亚洲熟妇成人精品一区| 曰韩无码二三区中文字幕| 男人生殖进入女人M| 在线播放亚洲第一字幕| 精品人妻AV无码一区二区三区| 欧美人与动性XXXXX杂性| 丰满人妻被黑人猛烈进入| 欧美乱妇无码毛片斯巴达三百勇士| 四虎永久在线精品免费一区二区| 色婷婷综合久久久久中文| 国产乱人伦偷精品视频免下载| 精品国产一区二区三区久久久狼| 精品国产精品国产偷麻豆| 成人免费无码片在线观看| 精品人妻VA出轨中文字幕| 日本JAPANESE丰满白浆| 成人WWW污污污网站免费大全|